summaryrefslogtreecommitdiff
path: root/tests/exslt/date
AgeCommit message (Expand)AuthorFilesLines
2007-10-10applied patch from Maurice van der Pot to fix EXSLT week-in-year extensonDaniel Veillard3-17/+112
2005-10-04applied fix to date:week-in-year posted to the mailing list by ThomasWilliam M. Brack2-4/+4
2004-11-08fixed problem with day-of-week-in-month (bug 157592) with patch from SalWilliam M. Brack1-1/+1
2004-09-30fixed problem with negative periods (bug 154021) changed expected output,William M. Brack1-2/+2
2004-09-24Fixed the output, DanielDaniel Veillard2-22/+21
2004-09-24add missing variable fixed some error callback data added new date:sumDaniel Veillard8-0/+203
2004-09-19fixed problem with timezone offset (bug 153000) changed regression testWilliam M. Brack1-1/+1
2004-09-18enhanced validation of date-time to catch bit-field overflow (bug 152836)William M. Brack4-0/+95
2004-03-06continued interrupt commit for enhanced "make tests"William M. Brack1-10/+30
2003-07-29changed sign of date:seconds as previously posted to the mailing listWilliam M. Brack1-8/+8
2003-07-14fixed bug 113520William M. Brack1-2/+2
2002-12-28add missing .cvsignore entriesJose Maria Celorio1-0/+2
2002-10-15closing #94933, any error will make the transformation abort with noDaniel Veillard2-19/+31
2002-09-18added recently discussed test casesIgor Zlatkovic1-0/+9
2002-04-26applied another patch from Charles Bozeman to enhance date/durationDaniel Veillard32-7/+584
2002-03-19added "make valgrind" targets to run the test suite under the debuggerDaniel Veillard1-2/+6
2002-03-04patch from Charles Bozeman for the exslt date extension added theDaniel Veillard50-0/+2599